The physical substance of a house is a pile of materials assembled from widely scattered sources. They undergo different kinds of and degrees of processing in large number of places, require many types of handling over periods that vary greatly in length, and uses the services of a multitude of people organized into many different sorts of business entity (Cox & Goodman, 1956) Contractor performance is critical to the success of any construction project as it is contractors who convert design...
Life-cycle costs and other direct costs can be defined as the total cost throughout its life including planning, design, procurement and support costs of the assets owned or used. Life cycle costing is divided into six-staged process. The first four stages which are plan life cycle costs analysis, select or develop life cycle model, apply life cycle model and documents and review life cycle results comprise the life cost planning phase. The last two stages which are preparing life cycle cost ...
Construction planning and preparation play a very important role in today s construction. The effectiveness of the planning and preparation lead to the success of a project including the quality and time consumed in completing the project. A good and properly planned construction site can improve the efficiency and even the safety of the construction operation. Therefore, to construct a good building, the step of planning cannot be eliminated or skipped in order to save the construction time ...
In planning to build the house, area of the house is one of the important aspects to be studied. Although the areas that have high risk of natural disaster to occur, there are still a lot of planning to build house over there. Therefore, in planning construction at each of the area like at hillside, the possibility of earthquake to occur, volcano eruption and others need to know about the composition and condition of ground soil, suitable design of the house for different area, the precaution...
Nowadays, building quality has been one of the important factors to satisfy customers. The priority of the customer is mainly based on quality rather than cost. In today's economy competition, it is getting more fierce and cruel than before. Products with good quality can attact buyers to purchase, therefore the pressure has been formed from customers leads the developers to provide the building product with excellence quality (Connections Magazine 2003). Connie (2001) acknowledges that facil...
Contract procurement has an impact on project performance in terms of costs, time and quality. During one of the briefing meetings at the pre-tender stage of a construction project, your Director has interest in collaborative procurement method and need your advice. In addition, your Director has multiple sites going on at the same time and therefore many site offices. Critically explain why collaborative procurement would be beneficial between the site offices to your Director. Masterman, (2...
Building maintenance normally regarded as the Cinderella of the building industry. The maintenance of the built environment affects everyone continually, for it is on the state of our homes, offices and factories that we depend not only for our comfort but also for our economic survival. Maintenance of the building will start from the day the builders and contractors leaves the site of the construction or after the construction is fully completed. Normally, all the building owners wants their...
CHAPTER 2 LITERATURE REVIEW 2.0 Introduction Risk is simply the measure of the likelihood that you will suffer harm from the hazard (G. Tyler Miller, Jr 2006) and every human endeavor involves risk (Dey and Ogunlana, 2004; Poh and Tah, 2006). Take for instance, the life time of developing cancer of the lung from smoking a pack of cigarettes per day is 1 in 250, which means that 1 of every 250 people who smoke a pack of cigarettes per day will develop lung cancer over a typical lifetime. It is...
Partnering is a way of improving the performance of any construction process, providing benefits for both parties involved. It is a new non-adversarial approach to the procurement in construction, dealing with the definition of a problem resolution process that helps to reduce litigation as quickly as problems arise. This paper attempts to verify the efficiency of partnering applied to a project, drawing upon theory and research from literary studies, in order to explore the philosophy of par...
This report is aimed at producing an effective project plan to British Airport Authority (BAA) using Heathrow terminal 5 as a case study. The methodology used in this project is the problem solving approach where a major problem is identified, the possible solution to the problem is analysed and the best solution for the implementation of the project is recommended. In producing this plan, a major problem of airport congestion was identified and an option appraisal was carried using the SWOT ...